The team has been keeping heads down in an effort to get the boat ready for transpac. Lots of effort is being put into the new mast being built for TP. The worklist is daunting but things are coming together. The boat is sitting at Driscoll’s, off the keel, while it is getting worked on. As if this wasn’t enough we are also sorting out deck layouts for the new boat. So we almost need 2 different mind sets.
Isabelle Farrar says
Good luck with all the work! If anyone can do it, you all can!