Well, the time has come and our new rig is en route to San Diego. We assembled the rig in Bristol last week and it left Thursday. We will be receiving the rig in San Diego on Wednesday where we will be assembling it and stepping shortly thereafter. Pirate has coordinated quite a bit of work on the boat. The new prod is on and longer than ever! The new Hall rig with Future Fibers Carbon rigging also look good. We are really all looking forward to getting this thing back together and on the water.
Speaking of that, we will be getting the boat into the water before long and start going through the paces. We have to trial the rig, bow sprit, and a long list of other upgrades.
Leave a Reply